Electrical Projects |
Rail Projects |
Civil Projects
| HDD Projects
HDD Projects > Foxes' Landing - Carlsbad, CA
Finalist for Trenchless Technology Magazine's Project of the Year 2000!
Read the article>
28 inch HDPE water line crossing under Interstate 5, Carlsbad, California. Drill site constructed next to homes and federal
wetlands (yellow line indicates bore path).

80 ton cranes lift the 28 inch casing into position during pullback operations.

28 inch HDPE casing bending a 90 degree turn while being elevated to match the 54% exit angle.

100,000lb American Augers drill. Bore length: 800 feet. Ground type: Sandstone/clay.

28 inch HDPE casing and 18 inch HDPE blue stripe water line during fusing and staging.

28 inch HDPE casing bending a 90 degree turn within a 150 foot radius, and being elevated to allow the 54 percent bore exit angle.

Electrical Projects |
Rail Projects |
Civil Projects
| HDD Projects
|